The 2023 operation schedule for the Wasauksing Swing Bridge:
April 15 to June 14, 2023, 07:00am to 7:00pm daily:
7:00am, 9:00am, 11:00am, 1:15pm, 3:00pm, 5:00pm. and 7:00pm.
June 15 to August 31, 2023, 07:00am to 9:00pm daily:
7:00am, 09:00am, 11:00am, 1:15pm, 3:00pm, 5:00pm, 7:00pm, and 9:00pm.
September 1 to November 26, 2023, 07:00am to 7:00pm daily:
7:00am, 9:00am, 11:00am, 1:15pm, 3:00pm, 5:00pm. and 7:00pm.
The bridge will not open when the 10 minute average wind speed exceeds 30 km/h, 10 minutes prior to that hour, and if there is a land-based emergency. The bridge will open on-demand for any water-based emergencies only if the winds are 30 km/h or less.